CONSTRUCTION OF TOILET MOCKUPS IN LEVEL 6 CENTRAL CONCOURSE OF TERMINAL 1

 

hkia-toilet_view2

hkia-toilet_basin

hkia-toilet_urinal

Scope of Work:

  • Carry out 3D Laser Scanning before and after demolition to provide precision dimensions for BIM modelling and pre-cast fabrication.
  • Building up the 3D BIM model based on point cloud and Building services drawings.
  • Implement modelling standards in 3D modelling.
  • Environment simulation by using Fuzor software and the implementation of VR technologies.
  • Construction Stage LOD 300-400)
  • As-built Stage (LOD 500)